AIME
PricingSign InGet started free
PricingSign InTry free

AI for construction compliance

Drawings in.Site paperwork out.

1234ABCD01D02D03P1P1P2MEETING 0112 m²MEETING 0210 m²BOARD16 m²L1L2COREVOIDOPEN PLAN142 m²RAF 600×600BREAKOUT38 m²840084008400N
Example

AIME reads your drawings and drafts method statements, risk assessments, inspection records and HSEQ documents, ready to review in minutes.

Get started freeWatch the full walkthrough· 2 min 11

14-day Business trial. No card required.

Aligned withCDM 2015AFS 2023:3AMABS ENWHS / OHS ActsAS/NZS

How it works

Three steps from drawings to a signed-off document.

No templates to fill in. Upload what you already have and review what AIME writes.

  1. 01

    Upload your project documents

    Drawings, specifications, product sheets and plans.

  2. 02

    AIME drafts the document

    It extracts the key information, classifies every reference and writes the method statement with its risk inventory and risk assessment.

  3. 03

    Review, approve and export

    Fine-tune any section, send it for approval by share link, export a print-ready PDF and generate the inspection record (AMA, BS EN or Australian Standards) from the same work parts.

What you get

Every document, from the same project files.

Upload once. Generate the method statement, inspection record and HSEQ documents, and a Radar estimate, from the same drawings and specifications.

  • 01

    AI-powered analysis

    AIME reads your drawings, product sheets and plans to fill in your method statement.

  • AFS 2023:3CDM 2015WHS Act
    02

    Aligned with AFS 2023:3, CDM 2015 and WHS law

    A built-in risk inventory covering all 25 AFS 2023:3 risk categories for Swedish sites, aligned with CDM 2015 for UK sites. Australian sites get a Safe Work Method Statement (SWMS) under the WHS or OHS Act of the state or territory, with high risk construction work identified.

  • 03

    Inspection records (Egenkontroll)

    Self-inspection documents to AMA (Sweden), UK standards (BS EN, CDM 2015, NBS) or Australian Standards (as an inspection and test plan), with full traceability, checkpoints and acceptance criteria.

  • 04

    Radar

    Analyse your tender documents for an estimate of programme, budget and workforce before work starts.

  • 05

    HSEQ documents

    Generate your full suite of HSEQ documents from tender documents: Quality Plans, Environmental Plans, Health and Safety Plans and Maintenance documents.

N

The output

A complete method statement, section by section.

Every generated document follows the same structure, so reviewers always know where to look. On Australian sites it is a Safe Work Method Statement (SWMS).

  1. 01Cover: activity, project, validity and sign-off
  2. 02Work description
  3. 03Work parts with quality controls
  4. 04Risk inventory (AFS 2023:3 in Sweden), 25 categories
  5. 05Risk assessment, 5 × 5 scoring before and after controls
  6. 06Permits and plans
  7. 07Sign-off with QR site sign-in

See it work

Get started free

14-day Business trial. No card required.

FAQ

Questions, answered.

Still have one? Email chris@aime-app.co

01Which regulations and standards does AIME work to?

Method statements include a risk inventory covering all 25 AFS 2023:3 risk categories for Swedish sites and are aligned with CDM 2015 for UK sites. For Australian sites AIME writes a Safe Work Method Statement (SWMS) under the Work Health and Safety Act and Regulations of the state or territory (the OHS Act in Victoria) and identifies high risk construction work. Inspection records follow AMA in Sweden, BS EN, CDM 2015 and NBS in the UK, and Australian Standards in Australia.

02Is the output ready to use on site?

It is a draft for you to check, not a finished document. Every section is editable, you create numbered revisions, and a competent person reviews, verifies and approves the document before it goes to site. Phrases you remove can be saved as exclusions, so AIME stops suggesting them on future documents.

03Does it work in Swedish and English?

The app and the generated documents are available in Swedish and English, and documents for Australian sites are written in Australian English. An approved method statement can also be translated into Norwegian, Danish, German, Finnish, Polish, Dutch, French, Spanish, Russian and Ukrainian for the workforce on site.

04Can my client or main contractor approve the document?

Yes. Share a link and they can approve it or request changes without creating an account. Operatives sign in on site with a QR code, and their sign-ins appear on the PDF sign-off page.

05Where is my data stored, and is it used to train AI models?

Account and document data is stored with Supabase in the EU. Uploaded documents are sent to Anthropic's Claude API for analysis only; Anthropic does not use submitted content to train its models. Payments are handled by Stripe and AIME stores no card details. ClayStack AB is the data controller under GDPR.

06How does the free trial work?

Every new account starts with a 14-day Business trial and no card is required. When it ends you can continue on the Free plan, with 2 method statements and 8 inspection records, or choose Pro or Business. Prices exclude VAT and you can cancel at any time.

Start your next method statement today.

Method statements and inspection records in minutes. 14-day Business trial, no card required.

Get started freeSee pricing
AIME

AI for construction compliance.

  • Pricing
  • Terms of Service
  • Privacy Policy
  • Data Processing Agreement

© 2026ClayStack· All rights reserved.

Example

Method statement and risk assessment

Raised access floor installation, Level 3

Activity RAF-MS-014 · Rev 2 · Valid until 11/05/2027

Valid
CoverWork descriptionWork partsAFS 2023:3Risk assessmentPermits & plansSign-ins
RiskLCRFControl measuresNew RF
Fall or trip at open floor edges and voids during panel laying34121Progressive edge protection and void covers; daily start-up inspection233
Manual handling of panel stacks339Mechanical lifting aids; two-person lifts; stacks kept below 1.2 m4
Dust from cutting panels to size428On-tool extraction; FFP3 masks; cutting station outside the work area2
Generated from: Floor plans · Product data sheet · Tender specification
  1. 1Risk before controls
  2. 2Control measures
  3. 3Risk after controls